Plainfield-Naperville Rd (CH 14) from 95th St to 111th St
Roadway reconstruction and widening to two lanes in each direction with landscaped median
|
Naperville
9/07
11/08
$10.7
|
IMPACT ON TRAVEL: Majority of roadway completed. Currently placing curb and gutter, bicycle path, and landscaping. Occasional temporary lane closures with flagmen. Also refer to IDOT construction report at:
http://www.dot.state.il.us/road/will.htm
|
|
Arsenal Rd (CH 17) East & West of BNSF Railroad
Roadway reconstruction and widening to five lanes
Signalize I-55 interchange ramps
|
Channahon/Elwood
5/06
11/08
$10.0
|
IMPACT ON TRAVEL: All roadway work completed. Remianing work includes landscaping, pavement reflectors and guard rail repair. Occasional temporary lane closures with flagmen. |
|
Peotone Beecher Road (CH24) from IL Route 50 east to 1/2 mile east of Western Avenue
Patching and Resurfacing
|
Will Township
9/08
11/08
$1.4
|
IMPACT ON TRAVEL: Temporary lane closurers with flagmen.
|
|
Old Monee Rd (CH 48) over Thorn Creek
Bridge Replacement
|
University Park
6/08
10/08
$0.928
|
IMPACT ON TRAVEL: Road closed. Detour directing traffic installed. Also refer to IDOT construction report at:
http://www.dot.state.il.us/road/will.htm
|
|
Veterans Parkway (CH 11) from Crossroads Parkway to IL Route 53
Roadway reconstruction and widening
|
Romeoville
10/08
11/10
$10.8
|
IMPACT ON TRAVEL: Utility relocations occurring during Fall 2008 and Winter 2009. A majority of road construction starts Spring 2009. Staged construction. Temporary lanes with one lane open in each direction. Occasional temporary lane closures with flagmen.
|